Project description.
The gas pipeline will transport 150 MMscfd with an initial pressure of 1,200 psig to supply natural gas to 31 municipalities in the north zone of Colombia.
Scope of work
Performed Technical and Administrative Consulting services for ECOPETROL during the construction of the Ballena Gas pipeline. Monitor the technical, administrative, financial and socio‑environmental areas of the contract with Centragas for the construction, operation and maintenance of the 575 km. 18” gas pipeline and 160 km. of branches..
Project description
The gas pipeline system consists of a 20 inch mainline with an approximate length of 340 Km. between the municipalities of Mariquita and Cali and laterals to 47 other municipalities along the same route with an approximate total length of 424 Km., each with a terminal station (city gate). The system has an inlet pressure at Mariquita of 1,200 psig and a delivery pressure in Cali of 250 psig..
Engineering Scope of Work
- Piping Design
- Detailes Piping design
- Detailed Drawings for Construction
- Piping Final “MTO”
- Architecture, Civil, Structuralm and Electrical designs
- Basic Engineering revision
- All Disciplines Final MTOl
- Gas Pipeline Mechanical and Civil design
- Coordination for final route selection
- Survey and topographical works coordination
- Geotechnical design Coordiantion
- Environmental stuides and designs Coordination
- Cathodic Protection design Coordination
- Obtention of Permits and Licences required
- As built drawings elaboration from marked up drawings
- Basic Engineering and hydraulic field evaluation. San Francisco Ing. and Hazop Unit Lact Gualanday
- Oversight Cartago Station - ECOPETROL Basic. & Conceptual Eng., OAM extension
- Detailed design - In line Mixture System Cartagena Refinery
- Gas systems - locations PF1-ES4-GHK
- Basic & detail engineering - Horizontal Burner - Hocol
- Whole contract BP (Eng. services, optimization studies, procurement, support in different areas.
- Opon By-pass settings for scrapers thrower - Copp
- Whole Contract Hocol (Conceptual, basic and detailed engineering development)
- Audit and inspection for civil works for oil mud remediation at Palagua and Toldado - Ecopetrol S.A.
- Audit and Inspection for enlistment works for remote operation of Galán, Lizama, Mansilla, Puente Aranda, Salgar, Gualanday y Neiva stations and integration of these systems with CCMO from VIT ( Ecopetrol S.A.).
- Well Pad facilities XL5 - engineering - PTS
- PDRI (Project Definition Rating Index) Audit for refinery and transport projects for Ecopetrol S.A.
- Economical and technical feaseability studies to move a thermal Plant from Gualanday - Hocol Project.
- Basic Engineer for Imported liquefied petroleum gas (LPG) System Optimization Project at Moin Station.
- Project management for Ecopetrol S.A. Oil Pipe Line and control system inspection. Coveñas Terminal and fire fighting system at Ayacucho Station.
- Floating storage Unit Coveñas (FSU) - ECOPETROL
- Central Oil Pipeline - Oleoducto Central de los Llanos
- Santiago Central Station
- Production facilities
- Meter Prover (Calibration Loop) For Santiago Central Station
- New Refinery at Concepción, Chile
- South Casanare transfer Line
- Chichimene Production Facilities
- Oleoducto de Colombia (ODC)
- ICP Fire Fighting system
- Oleoducto de Cusiana
- On shore Marine Fuel terminal at Bahía Málaga.
- New Product Pipeline from Sebastopol to Bogotá. Including Two Station and a Terminal.
- Enlargement of the pump station and storage
at Vasconia 1.
- Detailed engineering Updating for OLEODUCTO CENTRAL S.A.
- Pipe Stress Analysis for some refinery Piping at Barrancabermeja refinery.
- Basic engineering and environmental studies for Cisneros New Pump Station.
- Conceptual, Basic and detailed engineering for Coveñas Pump Station enlargement.
- Sebastopol Station Automation..
Santa Cruz - la Guardia, 12" Pipe line - Bolivia
- Engineering services - Palermo Association - HOCOL.
- Detailed Engineering for Limón - La Garita Pipe Line, Costa Rica
- Detailed engioneeroing for a LPG pump station at Paloma Carrasco, Bolivia
- Lact Unit Precommissioning & Commissioning - Hocol
- 8 MVA Thermoelectrical plant - Cartones de América - CAME
- Management for Transportation and Commissioning of Galanday Thermal Plant.
- TASAJERO Thermoelectrical Plant
- Assets reassesment project -Electrificadora Boyacá
- Thermal Plant training course.
- 150 MW - ISO Thermoelectrical Plant (turbogas) - Central Termoeléctrica Cerrejón
- Thermoelectrical plant - 15 MW , Perú
- Cogeneration Plant at Cerromatoso
- Thermoelectrical plant - Termopaipa IV
- Tasajero Thermoelectrical plant
- Maintenance of units I & II de Termopaipa
and Termocartagena I, II y III Power plants.
- Private power generation in Colombia
Thermoelectrical Plant - 150.000 KW ISO - Turbogas
- Cerrejón Thermoelectrical Plant. Change of fuel from fuel oil tpo natiural gas.
- Power electrical geneation - Electrificadoras Atlántico and Bolívar
- Construction BID evaluation for Termoeléctrica del Cerrejón
- Construction BID evaluation for enlargemnent of Termo B/lla and Termo C/gena
- Change of fuel from Carbon fuel to natural gas. Cartagena and Barranquilla Power plant - Corelca
- Design supervision - Termocartagena III.
- Economical and technical evaluation of the Bids for the Construction of the Central Termoeléctrica de Tasajero I (ICEL)
- Design basis and specs for a 600 MW Power plant.
- Construction BID evaluation. Award of Tasajero I Thermo electrical plant.
- Thermal feaseability stuides for a Thermal Power plant of 600 MW. Thermo electrical Optimization. Alto Anchicayá Power plant.
- Over heater Optimization Termopaipa II
- Thermal Optimization Barrancabermeja Plant.
- Gas Compression Station Project
- Ballena - Barrancabermeja Gas Pipeline.
- Mariquita - Cali Gas pipeline
Project Performance
- Existing information revision.
- Sub contractor coordination.
- Project Control. B.O.M.T Contract.
- Economical Control of the contract.
- Force majeure analysis
- Additional work not cosidered in the original SOW
- Stand By reclamation analysis
- Community relation
- emergency found Management
- Environmental supervision
- Preliminary instalation acceptance
- Archaeological monitoring and coordination
Scope of Work
Detailed engineering, Colombian subcontractors coordination, direct assistance to the project management, follow-up to the international purchases, national purchase activities, construction management (quality assurance) for the construction, and preparation of Operation and Maintenance Manuals of the Gasoducto de Occidente (Mariquita - Cali gas pipeline)
Project performance
- Desig/ Construction coordination, Procurement activities,material and equipment transport and legalization.
- Management and monitoring Colombian suppliers
- Coordination Between Spie Capag Ismocol and FLUOR, Inventory status and spare parts required for operation
- Cost Control and Project Control
- Engineering quality assurance. Planing Detailed reports, programming, progress and forecast.
- HSE program management.
- engineering and construction support.
- Start up assistance required by FLUOR
- Document and As built coordination.
- Environmental Basic line, research preparation and reports for all gas Pipe lines Right of Way